PS Sandwich Metrology
Introduction
Metrology is ran to determine and ensure that the modules built are within spec in terms of spacing for further instalation of the hybrids. A failure of the metrology will make the sandwich unusable for the detector.
Run time: (4 minutes)
Preparation
Remove 3D printed nuts to expose all 3 inserts
Place carrier plate against...
PS Module Base Plate Insert Gluing
Download PDF:
PDF Version
Introduction
Before gluing the PI (Kapton Polyimide) baseplate isolator, we need to attach the positioning inserts to the baseplate using the insert gluing jig.
Insert gluing procedure
Step 1: Cleaning
Clean the jig, pins and weight pieces with IPA (Isopropanol). If there is cured epoxy or carbon fiber residue on t...

ROH Bending Tool
Download PDF:
PDF Version
Introduction
Use the ROH bending tool to prepare the ROH tails. There are 4 components for the ROH
bending tool:
🔴 (A) Base
🟠(B) Hat
🟢 (C) First bend pair
🔵 (D) Second bend pair
ROH bending tool procedure
Step 1: Placing the ROH
Place the ROH on the base, with...

PS-s Carrier Plate
Introduction
Use this guide to assemble the carrier plate for the PS-s module.
Important! Wear gloves while handling the plate: The carrier plate is coated with ESD-safe material. To prevent degradation of the coating by finger grease and dirt, avoid direct contact with the plate.
Materials
Part
...